Big Bag Emptying Station

The big bag emptying station consists of a supporting frame with a lifting beam for the chain hoist and a loading
platform for the big bag.
The big bag is connected to the outlet system for a dust tight connection of the big bag
outlet.

 

The tensioning of the outlet spout is pneumatically operated. The big bag outlet is pulled over the inner tube with the sealing flange in the open position. The operator then lowers the sealing flange manually and secures the outlet. The system is sealed to the outside by profile seals. Dust escaping through the inner seal returns to the main product flow. A venting filter is connected to the big bag outlet connecting system with an automatic valve. The filter prevents the creation of dust during operation, product loss and cross contamination and allows the venting of the system during the opening of the big bag and the fluidization (with filtration) required for the transfer of the powder with the PTS system.

To ensure that no dust escapes after the emptying process when removing the empty big bag, the air must be evacuated and the big bag tied off. To evacuate the air, the suction is created thanks to the PTS and the automatic valve is closed thanks to a switch. The PTS system is operated until no air is present in the big bag.

 

 

 

 

Options:

  • Weighing system
  • Pneumatically operated bag manipulators for easy emptying controlled by a manual pneumatic push button
  • Suction hopper of stainless steel with integrated delumper, a manual fluidization ball valve and a protection filter
  • Electric or pneumatic chain hoist with 1 load chain and snatch block, installed in a motor hoist trolley with overload protection
  • Massage units

 

 

 Big bag massage unit for an easier discharge

 

 

 

Containment & Explosion protection

A currently realized project for a pharmaceutical company in France consisted of the loading of a reactor with a humid, difficult product containing methanol solvent. The light-sensitive and allergic product (minimum ignition energy < 1 mJ) is stored in big bags in refrigerated containters (0-4 °C). The big bags are emptied into a reactor.

The transfer takes place by means of a PTS system which is installed on top of the reactor and connected to the big bag emptying station installed on load cells. The PTS is sucking the humid product through its high vacuum out of the big bags and conveys it into the reactor by pressure. As the product is not free flowing, a special  fluidized lump breaker is integrated at the big bag outlet to ensure a continuous product flow.

  • Transfer accuracy of ± 0.5 kg per 155 kg
  • Containment value of < 50 μg/m3

     

Dietrich Engineering Consultants (Dec) is a family-owned company founded in 1987 in Lausanne, Switzerland. Dec proposes specific solutions to convey, dispense, mix and stock powder in the chemical, pharmaceutical and food industries. <p> PTS Powder transfer system DCS Drum Containment System MPTS Micro Powder Transfer System LBSC Lump breaker suction lance MPTS Mobile powder transfer system Batchmixer Powderflex <p> Powder handling Pulverfordersystem Manutention de poudres Sampling powder Probenahme Pulver Echantillonnage poudre Mixing powders Pulver mischen Mélanger poudres Dust containment Vacuum conveyor <p> <p><a href="/__Batchmixer-Powderflex/dec_dietrich_Powder_handling.html">Powder handling Pulverfordersystem Manutention de poudres</a> <p><a href="/__DCS-Drum_Containment_System/dec_dietrich_Powder_handling.html">PTS Powder transfer system</a> <a href="/__LBSC_Lump_breaker_suction_lance/Transfert_de_poudres.html">DCS - Drum Containment System</a> <p><a href="/__manutention_poudre_Transfert-Dosage-poudres/dietrich_engineering-consultants-Systeme-transfert_poudres.html">MPTS Micro Powder Transfer System</a><br> <p><a href="/__Mixing_powders_Pulver_mischen_Melanger_poudres_Dust_containment-Vacuum_conveyor/Transfert_de_poudres.html">LBSC Lump breaker suction lance</a><br> <p><a href="/__MPTS-Micro_Powder_Transfer_System/Pulvertransport_Manutention_poudres_Echantillonnage.html">Batchmixer Powderflex Manutention de poudres</a> <p><a href="/__MPTS-Mobile_powder_transfer_system/Pulvertransport_Manutention_poudres_Echantillonnage.html">Powder handling Pulverfordersystem</a><br> <p><a href="/__Powder_handling-Pulverfordersystem-Manutention_poudres/Pulvertransport_Manutention_poudres_Echantillonnage.html">Sampling powder Mixing powders Vacuum conveyor Mélanger poudres</a> <p><a href="/__powder_transfer_system/dec_dietrich_powder-transfer-systems-dosing-containment_powders.html">Probenahme Pulver Vacuum conveyor</a><br> <p><a href="/__PTS-Powder_transfer_system/Pulvertransport_Manutention_poudres_Echantillonnage.html">Dietrich Engineering Consultants</a> <p><a href="/__pulvertransport_pulverdosierung/Pulverfordersystem-Pulver-forder-System-probenehmer.html">Dec Lausanne Geneva Ecublens</a><br> <p><a href="/__Sampling_powder-Probenahme_Pulver_Echantillonnage_poudre/Pulvertransport_Manutention_poudres_Echantillonnage.html">Dec Lausanne Geneva Switzerland</a><br>